What if
How do I test a process change without running the experiment on customers?
The three ways to find out what a change will do before committing to it, what each costs, and the point at which arithmetic on paper stops being enough.
Section
Asking a question about a process before changing it, and knowing what the answer is worth.
What if
The three ways to find out what a change will do before committing to it, what each costs, and the point at which arithmetic on paper stops being enough.
Variation
Every process model asks how long a step takes, and answering with one number throws away the thing that causes the queue. What to collect instead, and how to read it.
Scheduling
Work does not stop arriving when a shift ends, but it does stop being processed. Every gap in the roster is a queue being filled by nobody.