Process Daily

Practice, metrics and method






Line balance

Our demand swings by half. Does takt time still apply?

Takt assumes steady demand and almost nobody has it. The answer is not to abandon it, and it is not to average the year. It is to pick the window you are willing to be wrong in.



More pieces

Everything we have published, by month


The paper

Three pieces a week, each one built around a calculation the reader can reproduce. Nothing is asserted here that was not checked, and no piece ends in a pitch.

  • Fundamentals

    The ideas the rest of it is built on, worked properly rather than defined and left there.

    6 pieces

  • Metrics and maths

    The measures that get quoted in meetings, what each one actually counts, and the arithmetic behind them.

    8 pieces

  • Lean tools

    Shop floor method: what each tool is for, and the conditions it needs to work at all.

    6 pieces

  • Case walkthroughs

    One process, followed end to end, with every number shown along the way.

    2 pieces

  • Simulation and what if

    Asking a question about a process before changing it, and knowing what the answer is worth.

    3 pieces